Completed and Ongoing Contracts
Recently we have completed the temporary and permanent steel sheet piling for the M1 Junctions 6-10 Widening Scheme for Balfour Beatty/Skanska Joint Venture. This section of the motorway is now open.
We have experience using crane barges and working off jack-up barges as well as large land based cranes of up to 280 tonne capacity. The P20 Superferry Terminal for ABP Ltd. at Hull docks had 24 No 34m long 762mm diameter tubular raking piles. We have only recently completed the installation of a cofferdam 62.00m x 21.00m using LX32 sheet piles up to 16m long for the Thameslink 2000 Tunnel at Kings Cross London on the Channel Tunnel Rail Link for the CTRL 103 JV of Kier Nuttall.
M25 - WIDENING JUNCTIONS 16-23 AND 27-30
We are currently undertaking all of the sheet piling works on Section 1 and Section 4 with our joint-venture partner CMP (Commercial Marine and Piling Ltd.), which involves permanent and temporary piling. These works are being carried out to provide the M25 with 4 lanes.
WEYMOUTH RELIEF ROAD
We are currently carrying out piling works for a new relief road into Weymouth which will be ready for the Olympics in 2012.

OLYMPICS 2012
We are currently undertaking temporary cofferdams within the Olympic Park to assist with the Utilities programme for the upcoming Olympics.

M1, JUNCTION 6 – 10, ROAD WIDENING SCHEME
We have completed all of the Steel Sheet requirements on the M1, Junction 6 – 10 road widening scheme.

This includes temporary and permanent works for the bridges/underpasses that are being widened to give the M1 a four lane facility in both directions.

Balfour Beatty Skanska Joint Venture

Conoco-Phillips Ltd., Immingham
We are currently installing Temporary Cofferdams for an extension to the plant.

Kier Construction Ltd.

SEWAGE TREATMENT WORKS AT MARCH IN CAMBRIDGESHIRE
Installation of Temporary Steel Sheet Piling to Humus and Storm Tanks at March.

Skanska Aker Kvaerner JV

QUEEN VICTORIA PROJECT AT CORUS WORKS IN SCUNTHORPE
Installation of Steel Sheet Piling to Queen Victoria Blast Furnace Slag Pit Project.

Corus Construction & Industrial

NAR OUSE REGENERATION SCHEME AT KINGS LYNN
Installation and Extraction of Steel Sheet Piling for the Nar Ouse Regeneration Scheme at Kings Lynn.

Birse Civils Limited

RETAINING WALL FOR SIRDAR SPINNING LIMITED
Steel Sheet Piled Retaining Wall for Sirdar Spinning Limited at Alverthorpe Beck, Wakefield, West Yorkshire.

Sirdar Spinning Limited

CIRCULAR COFFERDAM AT SEWAGE TREATMENT WORKS SANDY
Installation of Temporary Steel Sheet Piling to Circular Cofferdam Works at the Sewage Treatment Works at London Road, Sandy in Bedfordshire.

Skanska Construction Limited

PERMANENT “H” PILE KING POST SYSTEM
Installation of Permanent “H” Pile King Post System to Tesco Store, Great Horton Road and Havelock Street Boundary in Bradford.

Taylor Woodrow Construction Limited

CHANNEL TUNNEL RAIL LINK CONTRACT 103 KINGS CROSS LANDS CIVIL WORKS, LONDON
Temporary and permanent steel sheet piling to structures:
  • London West Portal – Permanent Larssen 6 (138 kg/m) piles 16m long.
  • Thameslink 2000 cofferdam – Permanent Larssen LX32 (HY) piles 14-16m long to form closed cofferdam. 62.00m x 21.00m.
  • Midland Mainline Bridge cofferdams using LX12 and LX25 piles 8 and 11m long. (KBC pile supply.)
Kier Nuttall JV

BRITISH WATERWAYS – GOOLE CAISSON

Temporary and permanent steel sheet piling 10m long within Canal complete with Wadit clutch sealant carried out in conjunction with Galliford Northern.

British Waterways

ABP LTD./RAILTRACK LTD. – HUMBER INTERNATIONAL TERMINAL

Permanent steel hi-modulus sheet piles and “H” bearing beams for permanent railway bridge 24m long.

Mowlem Northern Ltd.

CHANNEL TUNNEL RAIL LINK CONTRACT 310 RAINHAM ESSEX

Permanent steel sheet piling for new road bridge abutments to Rainham Creek North and South Bridges adjacent Ferry Lane Underpass, Rainham, Essex using Frodingham Section 5 piles up to 18.0m long.

Morgan-Vinci JV

M1-A1 LINK ROAD – LEEDS, ENGLAND

Permanent steel sheet piling for new M1 Road Bridge (Aire Valley Viaduct) temporary cofferdam to bridges and structures, “H” piles to bridge abutments.

Kvaerner/Balfour Beatty JV

A1(M) WALSHFORD TO DISFORTH

Temporary and permanent steel sheet piling to cofferdams to River Ure Crossing (Arrows Bridge) and road and railway bridges.

McAlpine – AMEC JV

A2/M2 COBHAM TO JUNCTION 4 WIDENING

Temporary steel sheet piling to Wouldham Road Bridge Installation and removal of free issue sheet piles to cofferdam for new bridge pier adjacent A2 for new M2 widening.

Costain Skanska Mowlem JV

A63 SELBY BY PASS SWING BRIDGE
Permanent and temporary steel sheet piling and combi piling to pivot pier cofferdam using Larssen LX25 piles 15m long, 610mm Ø tubular piles, 762mm Ø tubular piles and 1075mm Ø tubular piles up to 28m long. Pivot pier cofferdam 21.5m x 15.5m, with combi piles to Riverside. Permanent sheet piles were also installed to the William Jessop Canal Bridge.

Skanska UK

CHANNEL TUNNEL RAIL LINK 240 STRATFORD EAST TO BARRINGTON ROAD VENT

Installation of permanent steel sheet piles to retaining wall. Installation of temporary steel sheet piles to circular cofferdam incorporating Wadit clutch sealant.

Costain Skanska Bachy JV

WOODHALL SPA SEWAGE TREATMENT WORKS

Temporary Steel Sheet Piles to Sewage Treatment Works at Woodhall Spa.